Construction of Stone Masonry Footing

Construction of Stone Masonry Footing

Stone masonry foundations are used to support structural walls and transfer loads to the earth underneath them. It should fulfil its purpose without sinking or settling. The vertical load on a stone masonry footing should be applied. Stone Masonry Footing Construction Stone Masonry Footing Stone Masonry Footing Construction Excavation Dimensions for Stone Masonry Footing A trench of 1m to 1.5m depth should be excavated prior to the installation of stone masonry footing. The amount of loads placed on the footing would determine the width of the excavation. As a result, the width of the footing is determined by the applied loads as well as the qualities of the soil on which the footing is built. Then there’s the earth at the bottom of the mountain.

Stones must have the following characteristics in order to be used in the building of stone masonry footing:The stone should be long-lasting. void of cracks void of cavities It must be difficult and demanding. Granite, hard laminated stand stone and limestone, and bluestone are examples of stones that are suitable for stone masonry footing construction. Stone Dimensions Desired Stones should be one-fourth the width of their width in thickness. If at all possible, the breadth of each stone used in the first course of the footing should match the width of the stone masonry footing. If such stones aren’t available, joints can be used instead, which is okay. Stone Preparation for Stone Masonry Construction Before they can be used, stones must be thoroughly wetted.

Concrete Mix Ratio used for Plain Concrete Bed

One part cement, four parts sand, and eight parts coarse aggregate make up the plain concrete bed at the bottom of the foundation. The aggregate’s maximum size is 40mm. Plain Concrete Bed Dimensions The thickness of the plain concrete bed varies from 10cm to 15cm. On each side of the bottom course, the plain concrete layer should reach about 15cm from the stone masonry foundation. As a result, plain concrete is 30cm broader than the stone masonry footing’s bottom course. At the bottom of the stone masonry footing is plain concrete. Plain concrete at the bottom of a stone masonry footing Stone Masonry Footing Mortar Ratio Mortar is used to build the necessary connection between stone joints.

Mortar is used between stone joints to produce the necessary binding and to seal the joint to prevent water infiltration. The proportion of cement to sand in the mortar is one part cement to six parts sand. Steps to Build a Stone Masonry Footing A layer of plain concrete will be placed at the bottom of the trench after it has been dug and prepped. The construction of the stone masonry footing will begin with the laying of a layer of mortar on which the first stone masonry course will be installed after the plain concrete bed has been set. Stones should be put close together, with a maximum joint distance of 2 cm between them. Mortar is used to fill up the gaps between the stones that have been put: Using mortar to fill joints between stones.

Stone Masonry Footing Construction Steps

Long vertical joints should be avoided since they are an area of vulnerability for stone masonry footings. Bond stones will be set at a 1m spacing to strengthen the strength of the stone masonry footing. The bond stones will go through the stone masonry footing’s thickness. During the construction of a stone masonry footing, bond stones are placed: During the construction of a stone masonry footing, bond stones are placed. If the stone masonry footing is thick, the length of bond stone should be increased to get the desired result. This can be achieved by stacking two or more bond stones on top of each other. The heart stones, which go in the midst of the stone masonry footing, should be as close together as possible.

Masonry footing is a wall’s structural foundation. A masonry foundation’s purpose is to support the structure’s weight and securely transfer the load to the ground without sinking or settling. Stone Masonry should be built before anything else. Footing trenches are dug to a depth of about 1 to 1.5 metres, and a layer of simple cement concrete comprised of one part cement, four parts sand, and eight parts coarse aggregates (40 mm) is laid to a thickness of 100 to 150 mm. The bed concrete from the lowest course of Masonry generally protrudes 150 mm. The footing is constructed on top of this belt. The foundation is laid out in a stepped pattern.

Mortar Ratio for Stone Masonry Footing

Before using any stones, make sure they’re damp. Each stone should be placed near to the stones that have already been laid on the 1: 6 Cement Mortar. The thickness of the joint must not exceed 20 mm. Faced Stones should be positioned in such a way that the vertical joints are staggered, and large vertical joints should be avoided. At regular intervals, bond or through stones going right through the thickness of the walls must be provided. A set of two or more bond stones overlapping each other may be required for wider wall foundations. Stones for hardening or interior filling should be placed as near to each other as feasible and firmly embedded in the mortar. There must be no hollow spaces in the stonework. Ensure that no water is present.

Stone density should have been one-fourth of their breadth b. Ensure that the breadth of each stone used in the first course of the footing is the same as the stone masonry footing width. If such stones are not accessible, joints should be made and the result is acceptable. Stone Masonry Construction Formation: Stones should have been thoroughly soaked before being placed in the foundation. This precaution is designed to prevent water from penetrating the mortar and causing damage. For a plain concrete bed, the following concrete mix ratio was used: One part cement, four parts sand, and eight parts coarse aggregate make up the plain concrete bed at the bottom of the foundation. The aggregate with the largest size.

Dimensions of Plain Concrete Bed

Stone masonry is a composite material made up of stone units and mortar (or just stones), constructed in a variety of ways, and used to construct load-bearing structures. A structural foundation built up to support walls is known as stone masonry footing. Several characteristics of stone masonry footing are listed below. Stone Masonry Footing’s Purpose The purpose of a stone masonry foundation is to support structural walls and transfer load to the earth beneath them. It should accomplish its goal without settling or sinking. The vertical load should have been applied on the stone masonry footing. Stone Masonry Footing Construction Excavation Dimensions for Stone Masonry Footing A trench must be dug before the stone masonry footing can be built.

Rammed earth foundations are constructed of well-graded dirt with a stabiliser for increased water resistance and strength. The site must be well-drained, and the foundation must be well-protected from ground moisture, preferably with plastic foil or bituminous felt. Alternatives include bitumen paint, rubble stone, or charred bricks. Rammed earth foundations should not be used if there is any concern about their suitability. Stabilized dirt blocks can be substituted, although equivalent safeguards are required. The soil foundation should be laid on a concrete footing whenever possible. The foundation, like the walls, is built in formwork: layers of 10 cm earth are tamped down to 6 – 7 cm before the next layer is added.

What is masonry footing?

Masonry spread footing is constructed from good quality bricks or stone.

What is the depth of stone foundation?

Prior to the construction of stone masonry footing, a trench with depth ranges.

What is stone masonry in construction?

Stone masonry is a type of building masonry construction that uses stones and mortar.

Also Check