Calculation of Shuttering of Footing
Shuttering is Calculated in square meter or square feet.
Use of Shuttering
- To prevent the loss and segregation to freshly mixed concrete
- To give a specific shape to concrete
Example:
Lets take a rectangle footing of size 3.00 X 5.00 m and Depth of 0.50 m
Calculation
- All side of footing which is covered with shuttering
- Two short side = 2 x 3.00 x 0.50 = 3.00 m2
- Two long side = 2 x 5.00 x 0.50 = 5.00 m2
- Total Shuttering area = 8.00 m2
Calculation of Concrete Quantity of Footing
Concrete Quantity is Calculated in cubic meter or cubic feet.
Example:
Lets take a rectangle footing of size 3.00 X 5.00 m and Depth of 0.50 m
Calculation
- Total volume of Cuboid is the Final Quantity of Concrete = 3.00 X 5.00 x 0.50 m
- Total Concrete Quantity = 7.50 m3
how to provide shuttering for circular footing with 1.25M height. help me find the solutions
hey there and thank you in your info – I’ve certainly picked up something new from right here. I did alternatively experience several technical points the use of this web site, as I skilled to reload the website many occasions prior to I may get it to load properly. I have been brooding about in case your web host is OK? Now not that I’m complaining, however slow loading instances times will very frequently have an effect on your placement in google and can damage your high-quality ranking if advertising and ***********|advertising|advertising|advertising and *********** with Adwords. Well I’m including this RSS to my e-mail and can look out for a lot extra of your respective fascinating content. Ensure that you replace this again soon..